HT ( High Tension )- 11 KV
- Installations of RCC poles, RSJ/11 Mts long spun poles with GOS, HORN GAP Fuse cross arms, insulators, guy sets, conductor, stringing of conductors, chain link fencing, complete as required by E.B.
- Installation of double pole structure with metering cubicle.
- Installation of HT metering cubicle with or without incoming isolator.
- Incoming isolator Ring mains unit (RMU) with loop in and out isolator and outgoing isolator with HRC fuse and HT metering cubicle and HT cabling.
- HRC fuse ring main unit with loop in isolator and outgoing 11kv breaker and HT metering cubicle total substation with distribution transformer.
- Installation of 11KV/433v Distribution Transformer indoor/outdoor with all required protection as required by E.B.
- Approvals: Inspection and Testing of HT Installation from Department of Electrical inspectorate.